Cautions in Installation

Cautions in Installation

In order to confirm actions and make adjustment,install the blower in a place convenient for checking and repairs. Toprevent adverse flow in case the blower stops,add a check vale.If possible, install the check valve at a position higher than the water level in the aeration tank.

If sludge and dust might accumulate, heighten the blower`s base. If sludge accumulates around the motor or blower,it will be difficult for the motor to radiate heat.This might lead to a breakdown or mooto burn itself out.In this case , lay another pipeline(a device as shown in the above drawing) to stir water around the blower so sludge will not stick to it.


Cautions in Inlet and Outlet

The inlet muffler should be erected and installed outdoors to avoid taking in damp air from the tank(as shown in drawing [1] )

The inlet muffler should be mstalled at least 1m/m,above the ground in an open area so it can be easily cleaned if dust accumulates.As shown in drawing[2],if the muffler will become very damp,which might rust the blade wheel and casue a breakdown  .Avoid such sifuation if possible.

The spare set,being stored for a long time ,might gather rust and check. Be sure to turn it on 30 minutes reglarly(weekly). If it is srored in a damp place,turn it on daily.

Detail


Major Specifications of Type GWB
Advantages
Suitable Places
Performance Table & Curve Drawing
Structure & Material list
Dimensions
Cautions in installation
-back to top-
Tel:886-6-5850446
Address :NO.414 ,Sheau Shin Yug ,Shann Huah ,
Tainan ,741, Taiwan
Fax:886-6-5850449
E-mail: weihautin@gmail.com
Copyright (C) 2007 King Chain Environmental Conservation Machinery Co.,Ltd. All rights reserved.